首页 体育内容详情
澳洲幸运5玩法(www.a55555.net)_PM says opening of MRT Putrajaya line to revitalise development along route

澳洲幸运5玩法(www.a55555.net)_PM says opening of MRT Putrajaya line to revitalise development along route

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

澳洲幸运5玩法www.a55555.net)?澳洲幸运5是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

,Prime Minister Ismail Sabri Yaakob speaks at the launch of the Putrajaya Line Mass Rapid Transit at Stesen MRT Kampung Batu in Kuala Lumpur. – The Malaysian Insight pic by Nazir Sufari, June 16, 2022.

THE opening of the Mass Rapid Transit (MRT) Putrajaya Line is expected to trigger and revitalise development in old, existing areas, as well as areas yet to be developed, said Prime Minister Ismail Sabri Yaakob. 

He said with the opening of the new line, the government was confident that areas located along the route, such as Jinjang, Sungai Buloh, Kepong and Bandar Sri Damansara, could develop more rapidly to be on par with other areas.

“The MRT Putrajaya Line Phase 1 involves the route from Kwasa Damansara to Kampung Batu, while Phase 2, which is almost fully completed, involves the route from Kampung Batu to Putrajaya.

“The Phase 2 route will run across strategic areas including Kuala Lumpur city centre with underground stations at Titiwangsa, Kuala Lumpur Hospital, Ampang Park, Persiaran KLCC and Tun Razak Exchange (TRX),” he said at the launch of the MRT Putrajaya Line Phase 1 at Kampung Batu MRT station in Kuala Lumpur today.

Also present were Finance Minister Zafrul Tengku Abdul Aziz, Transport Minister Dr Wee Ka Siong, Minister in the Prime Minister’s Department (Economy) Mustapa Mohamed and Federal Territories Minister Shahidan Kassim. 

Ismail Sabri said the MRT Putrajaya Line was expected to become the catalyst for improving connections between residents and communities, especially those living close to the line.

“It will be easier for the people to travel and commute to work, to socialise and to access other public facilities,” he said.

The prime minister said the 57.7km MRT Putrajaya Line has 36 stations comprising 27 elevated stations and nine underground stations with a total construction cost of RM30.53 billion.

In celebration of the line’s opening, Ismail Sabri also announced one-month free rides on all public transport operated by RapidKL, namely MRT, Light Rail Transit  (LRT), Bus Rail Transit (BRT), Monorel and RapidKL buses, starting today.

“I hope members of the Malaysian Family will take this opportunity to try using public transport by parking their cars at the Park N Ride facility and take a ride on the MRT,” he said. 

Ismail Sabri said the full opening of the MRT Putrajaya Line was expected to record an initial daily passenger count of over 104,000 and was hoped to reduce traffic congestion currently plaguing the capital.

  • 皇冠登3出租(www.huangguan.us) @回复Ta

    2022-06-30 00:14:52 

    当日新增治愈出院病例88例,解除医学观察的密切接触者2975人,重症病例较前一日减少1例。 累了的时候看这个

    • 香薰恋乆 @回复Ta

      2022-07-05 12:58:08 

      第42分钟,拉尔森主罚左侧角球,第一点被莱昂纳多头球解围,拉尔森二点得球再给到禁区,头球争抢后落到后点,孙国文迎球怒射打进,大连人1-0领先成都蓉城。随后上半场比赛结束,大连人1-0暂时领先。这是爽文啊

发布评论